Did you know WeOS devices take between 10-14 seconds to go from power on to fully operational?
The L2 and L3 managed WeOS devices can go from initial power on to fully forwarding including routing and firewall in less than 14 seconds. Some comparable products on the market can take up to a minute and some as long as 6-7 minutes. The quick boot time means that the network will be fully operational long before the PLCs, SCADA or DCS are operational. This makes the whole system boot process much quicker and with few alarms due to communication errors.
WeOS, Westermo Operating System, bietet umfassende Features von IP-Netzwerkstandards, welche die Erstellung belastbarer, sicherer und flexibler Netzwerke ermöglicht.
mehr dazuNuri Shakeer
International sales
Bitte nutzen Sie für Supportanfragen unser Support Formular